Below we've outlined our application development
process:
1.
Initial talks - We exchange mails and documents regarding the
application you need us to develop for you or modify for you.
All the mail description about requirements is stated in these
documents.
2.
Proposal - After getting all
the information from you about the application you are looking
for, we analyze your requirements properly and look for the
best platform to develop that application. We consider all the
points, which should be and then give you a details proposal
about the development details, time frame and the financial
terms.
3.
Application prototype -
As soon as you finalize the proposal, we give
you the prototype of the application, which is to be developed
with proper navigation but without any functionality. It is
here that you tell us for any corrections that are to be made
in the design of the software/application
4.
Coding - After we are finally approved with the
prototype, then we start the coding part of the application in
the proper module break-ups as submitted in the proposal. This
way we minimize the time that would have been wasted on
recoding if the prototype was not finalized.
5.
In-House testing - After we are through with one module, then we
do the in-house testing of that module before giving it to you
for final testing.
6.
Module
testing - On completion of the in-house testing of the
module, we submit that to you so that you can test that and
let us know about any bugs/fixes that we had left
out.
7.
Integration - Once all the modules of the application are
finalized, we integrate them all together to form an
application.
8.
Final in-house testing
- At last, we do the final in-house testing so
that the bugs, which might have come up cause of the
integration, can be fixed.
9. Final Deployment - Then the application is finally deployed at
the client end and client does the final testing.
10.
Reports - At the end, all the reports relating to the
application, like database report, application flow, index,
help, etc. These are submitted to the client during the
support period of the application.
The
Website development process varies
a bit as it involves approval of the layout design by the
client and also the mock-up submission after finalizing which